Home » Crossing the stone bridge
Crossing the Pont de Pierre
Due to heritage conservation work, traffic conditions on the stone bridge will be adapted from May 5, 2025 for a period of 4 years.
From June 2 to August 31: only on foot or by bike!
From June 2 to August 31, only pedestrians and cyclists will be able to cross the Pont de Pierre. Traffic on the Pont de Pierre will be closed:
- For buses, from May 5 and for a period of 4 years, involving the detour of Lianes 16 via the Saint-Jean bridge.
- On streetcars, from June 2 to August 31, leading to an interruption of streetcar A between "Sainte-Catherine" and "Stalingrad".
Pedestrians and cyclists will be able to cross the stone bridge alternately on the upstream and downstream sides, depending on the progress of the work. For everyone’s safety, remember to adapt your speed!
- Good to know:
- On foot, it takes around 10 minutes to cross the stone bridge.
- By bike, you can also cross the Chaban-Delmas bridge and the Point Saint-Jean. Think about it!
- All relay buses and regular routes are accessible to people with reduced mobility. In case of need, two services are available: Mobi'Vélo and Mobibus.
Mobi’Vélo
- For people with reduced mobility (excluding wheelchair users).
- Between Stalingrad and Sainte-Catherine, via Porte de Bourgogne and the Pont de Pierre.
- Capacity: 2 passengers per vehicle (2 vehicles).
- Hours: Monday to Saturday 7am to 8pm and Sunday 10am to 8pm.
- Frequency: 20 minutes.
- Included in all TBM tickets.
Mobibus
- Reinforcements are in place for the duration of the work.
- To benefit, contact Mobibus on 05 56 166 166 (choice 1).
Other ways to cross the Garonne
Via the river with LE BATO or via the Saint-Jean bridge, the Simone-Veil bridge and the Chaban-Delmas bridge with regular bus routes, find all the alternatives to the stone bridge by consulting the smart route map!